Turboexpander Modernization at an Air Separation Plant

Project Sheet

Sector

Renewable Gases

Country

Spain

Scope

Construction Supervision, Detail engineering, Inspection

Year

2025

Customer

OXINORTE - OXIGENO DEL NORTE, S.A.

Detail engineering and construction supervision services for the replacement of turboexpanders in an air separation plant, ensuring seamless equipment integration and uninterrupted plant operation.

Turboexpander Modernization at an Air Separation Plant

The Challenge

Replacement of two nitrogen turboexpanders that had reached the end of their operational life, while ensuring the integration of the new equipment into an operating air separation plant without affecting process continuity or plant safety.

The main challenge was to adapt the technical requirements of the new equipment to the existing infrastructure, ensuring compatibility, efficiency, and operational reliability.

The Solution

EIA21 carried out a technical review of the manufacturer’s documentation for the new turboexpanders and defined the design parameters required for their successful integration into the plant.

Based on this analysis, detailed engineering for the interconnecting piping systems was developed, including sizing, routing, and adaptation to the operating conditions required by the equipment, ensuring proper installation and reliable performance.

Results

The new process interconnections were successfully designed and implemented, ensuring optimal integration of the turboexpanders within the existing plant.

The project enabled:

  • Ensuring uninterrupted plant operation.
  • Improving the reliability and efficiency of the air separation system.
  • Adapting existing infrastructure to meet the technical requirements of the new equipment.
  • Minimizing risks during construction and commissioning activities.