The Challenge
The RESLAG Pilot Plant was conceived to validate innovative technologies for recovering thermal energy from steelmaking off-gases and slag, transforming waste heat into a valuable energy resource capable of improving industrial process efficiency.
This demonstration-scale facility was designed to support the development of new solutions for energy recovery in one of the most energy-intensive industrial sectors.
The main project challenges included:
- Adapting an experimental facility to ensure safe and reliable operation.
- Integrating multiple engineering disciplines within a research and development environment.
- Validating the technical feasibility of innovative waste heat recovery systems.
- Coordinating the activities required for the start-up of a pioneering pilot plant.
- Meeting the technical, operational, and safety requirements of a demonstration-scale industrial installation.
The Solution
EIA21 developed a multidisciplinary engineering solution focused on the comprehensive adaptation of the pilot plant, implementing the modifications required to optimize operability and facilitate commissioning.
The scope of work included:
- Review and update of the existing engineering documentation.
- Development of detailed engineering for plant modifications and upgrades.
- Coordination of all engineering disciplines involved in the project.
- Technical support during implementation and installation activities.
- Supervision of pre-commissioning works.
- Assistance during testing, commissioning, and start-up activities.
Results
- Validation and completion of the engineering required for plant commissioning.
- Successful execution of the pilot plant adaptation project.
- Start-up and operation of the facility according to project objectives.
- Contribution to the development of innovative energy recovery solutions for the steel industry.
- Support for research initiatives focused on industrial energy efficiency and decarbonization.