BLUE EAGLE Vessel – FPSO (Floating Production, Storage and Offloading)

Project Profile

Sector

Naval

Country

Spain

Scope

Detail Engineering

Year

2019-2020

Customer

ASTILLEROS ARMON, S.A.

Development of the Detailed Outfitting Engineering for the Blue Eagle FPSO (Floating Production, Storage and Offloading), built for Blue Marine (Durandco Group). The project included the design and coordination of piping systems, steel outfitting, HVAC systems, and auxiliary services for an offshore unit dedicated to crude oil storage and processing.

BLUE EAGLE Vessel – FPSO (Floating Production, Storage and Offloading)

The Challenge

The project required the comprehensive development of detailed outfitting engineering for a technically complex FPSO unit, where the effective integration of multiple onboard systems was essential to ensure operational efficiency, safety, and maintainability throughout the vessel’s lifecycle.

As an offshore production and storage facility, the Blue Eagle FPSO demanded the coordination of a large number of process, utility, safety, and support systems within a restricted and highly regulated environment.

Key project challenges included:

  • Coordinating numerous piping and auxiliary systems within limited onboard spaces.
  • Integrating process, operational, and safety systems into a unified offshore platform.
  • Optimizing piping, ventilation, and cable tray routing to facilitate construction and maintenance activities.
  • Ensuring continuous coordination among all engineering disciplines involved in vessel design.
  • Complying with offshore regulations and technical requirements applicable to hydrocarbon production, storage, and processing facilities.

The Solution

EIA21 developed the Detailed Outfitting Engineering using advanced 3D modeling tools, ensuring full multidisciplinary coordination and seamless integration of all vessel systems.

The scope of work included:

  • Piping Design for:
    • Exhaust and vent systems
    • Firefighting systems
    • Freshwater and seawater cooling systems
    • Ballast and bilge systems
    • Steam and condensate systems
    • Fuel oil systems
    • Raw water, chilled water, and potable water systems
    • Wastewater and sewage systems
    • Cargo handling systems
    • Inert gas systems
    • Lubrication systems
    • Service air and starting air systems
    • Foam firefighting systems
  • Design and routing of electrical and control cable trays.
  • Ventilation and HVAC ducting design.
  • Coordination of structural penetrations and openings.
  • Full integration of all systems through 3D modeling in a PDMS environment.

Results

  • Successful completion of the Detailed Outfitting Engineering for the Blue Eagle FPSO.
  • Efficient coordination of piping, ventilation, and cable routing systems within a 3D environment.
  • Improved constructability and installation efficiency during vessel construction.
  • Compliance with all technical requirements established by the shipyard and vessel owner.
  • Participation in a highly complex offshore naval project with demanding technical and operational requirements.