Construction Supervision, Detail Engineering, FEED, Procurement Management

Year

2010-2012

Customer

DURO FELGUERA ENERGIA

Engineering development for the Termocentro Combined Cycle Power Plant, a 2×1 multi-shaft facility incorporating Siemens SCC6-5000F (60 Hz) technology with an installed capacity of 1,080 MW, located in Santa Teresa, Miranda State, Venezuela.

Combined Cycle Power Plant Termocentro (1,080 MW)

The Challenge

The Termocentro Combined Cycle Power Plant represented a major milestone for EIA21 as the company’s first combined cycle power generation project.

Key project challenges included:

  • Execution of EIA21’s first combined cycle power plant project.
  • Development of a complete 3D model using PDS despite having no previous experience with the platform.
  • Continuous adaptation to evolving client requirements across all engineering disciplines.
  • Multidisciplinary coordination with Siemens for the integration of major equipment and auxiliary systems.
  • Execution of advanced process calculations, including pressure drop analyses and pump sizing studies.
  • Implementation of the first intelligent P&IDs developed by EIA21.
  • Design and modularization of pipe racks to optimize costs and minimize on-site construction activities.

The Solution

To address the project’s technical and operational challenges, EIA21 implemented a strategy based on technological innovation, specialized engineering expertise, and international coordination.

The scope of work included:

  • Implementation of CADWorx for initial 3D modeling and subsequent migration of the project to PDS.
  • Incorporation of specialized engineering personnel to strengthen modeling and design capabilities.
  • Technical coordination with Siemens through engineering workshops and working sessions in Orlando, USA, together with Duro Felguera’s team.
  • Development of process and equipment engineering in compliance with Siemens’ technological standards.
  • Definition and implementation of a modularization strategy that significantly reduced field installation activities.
  • Supervision of module fabrication and assembly to ensure quality and compliance with project specifications.
  • Detailed engineering development across all major disciplines.
  • Procurement management and technical support during equipment acquisition phases.

Results

  • Final design fully aligned with client requirements and project specifications.
  • Successful integration of advanced engineering and 3D modeling technologies.
  • Implementation of EIA21’s first intelligent P&ID system.
  • Optimization of construction costs and schedules through modularization strategies.